SERVICE & SUPPORT
Technical support
From selection and commissioning to troubleshooting, our engineers support you at every stage.
REFERENCE / INDEX
- Phone
- 13713675957
- Engineering response
- Within 1 business day
- Service scope
- Selection · commissioning · O&M
Frequently asked questions
Find an answer quickly
Answers on usage, installation, communications and troubleshooting.
01CommunicationsWhich industrial protocols are supported?
Which industrial protocols are supported?
Typical project interfaces include OPC, Modbus TCP/RTU and industrial Ethernet, with Siemens S7 PLCs common in the field. Actual protocol support depends on the specific controllers, instruments and driver versions; equipment lists and compatibility are confirmed before project start.
02CommunicationsHow is control network stability and redundancy ensured?
How is control network stability and redundancy ensured?
Critical systems typically use redundant ring networks, dual uplinks, a separate supervision network and industrial firewalls for segmentation. For continuous processes, network diagnostics, fast convergence and failover testing are also designed in. Switches and topology are planned around site scale and traffic, not added after the fact.
03CommunicationsWill data be lost if the edge device loses connectivity?
Will data be lost if the edge device loses connectivity?
Edge access can be configured with local buffering and store-and-forward. During outages it continues acquiring and buffering data in time order, then replays automatically once connectivity returns. Buffer capacity and retention depend on tag count, acquisition frequency and local storage, and are confirmed during selection.
04InstallationWhat are the installation requirements for control cabinets?
What are the installation requirements for control cabinets?
Cabinets should be installed indoors with good ventilation, minimal vibration and no corrosive gases. Sufficient front and rear access is required; ambient temperature, ingress protection and thermal management must be confirmed against the internal equipment and site conditions. For dust, humidity or corrosive media, protection and corrosion measures must be agreed during design.
05InstallationDoes a retrofit require production shutdown?
Does a retrofit require production shutdown?
In most cases, phased cutover and parallel operation avoid a full plant shutdown. The exact approach depends on process continuity, existing system condition and available windows. We survey the site first, then define read-only supervision, migration of non-critical loops, timed cutover of critical loops and rollback plans to minimise impact.
06InstallationWho is responsible for site installation?
Who is responsible for site installation?
Zhuochuang can provide integrated service from cabinet manufacturing to site installation, wiring checks, commissioning and training, or provide technical guidance and commissioning under a split scope. Responsibility boundaries are defined in the contract and technical agreement to keep interfaces clear.
07ServiceWhat after-sales service is provided after system handover?
What after-sales service is provided after system handover?
After handover, we provide fault response, remote diagnostics and necessary on-site support during the warranty period, with response times and scope defined in the contract. After warranty, annual O&M services can include inspections, health checks, software backup, fault handling and optimisation recommendations.
08ServiceCan you train our operations and maintenance staff?
Can you train our operations and maintenance staff?
Yes. Training can cover system operation, alarm handling, parameter maintenance, routine backup and basic troubleshooting, delivered on site, online or through operating manuals. For regulated industries such as pharmaceuticals, training records can be provided in line with validation requirements.
09SoftwareDoes SCADA support electronic signatures and audit trails?
Does SCADA support electronic signatures and audit trails?
User permissions, operation records and audit trails can be configured against the project validation strategy. Whether electronic signatures are enabled and how audit records are scoped and retained must be confirmed during validation against the client's quality system and applicable regulations.
10SoftwareHow long is historical data retained, and how is it backed up?
How long is historical data retained, and how is it backed up?
Retention depends on data volume, sampling interval and storage design, and is configured during solution design. A layered strategy of local historian, scheduled backup and offsite/cloud archiving is recommended. Backup effectiveness must be proven by periodic recovery drills, not simply backup task success messages.
11TroubleshootingHow should I troubleshoot when the SCADA host cannot connect to the PLC?
How should I troubleshoot when the SCADA host cannot connect to the PLC?
Work in order from physical to application layer: check PLC and switch indicators, power and cabling; verify IP address, subnet mask and VLAN; confirm ports, protocol configuration and access permissions; finally check register addresses and data mapping. If there were recent network or equipment changes, review the change record first.
12TroubleshootingWhat should I do if a historical trend suddenly stops?
What should I do if a historical trend suddenly stops?
First confirm whether live values are still updating, to distinguish acquisition, communication and storage issues. Check SCADA service status, disk space, historian connectivity and time synchronisation. If multiple sites fail simultaneously, inspect the central network or servers first; a single-site failure is more likely an edge device or communication link issue.
13TroubleshootingWhy does the control cabinet alarm when field equipment is running normally?
Why does the control cabinet alarm when field equipment is running normally?
The cause may be a signal circuit, sensor, drive status definition or control logic. Check alarm-point wiring, input signal levels, equipment status feedback and alarm delays. For VFDs and soft starters, distinguish run, fault and ready status bits to avoid treating a non-fault state as an alarm.
14Product usageDoes the system integrate with our existing PLCs and instruments?
Does the system integrate with our existing PLCs and instruments?
Yes, on a project basis. The platform can connect to mainstream PLCs, instruments and power meters via common protocols such as PROFINET, Modbus TCP/RTU and OPC. Legacy equipment without a standard interface can be connected through hard-wiring or protocol converters. Final feasibility depends on model and protocol version confirmed during a site survey.
15Product usageCan the platform be deployed in the cloud, and does data have to leave the plant?
Can the platform be deployed in the cloud, and does data have to leave the plant?
Yes. The platform supports on-premise servers, private cloud and cloud-edge deployment. For security, we recommend uploading only necessary KPIs to the cloud while retaining raw data at local edge nodes or within the client network. Boundaries are defined during solution design based on data classification and security requirements.
16Product usageCan the system generate reports in our own format?
Can the system generate reports in our own format?
Yes. Report templates, periods, shift definitions, data definitions and export formats are configurable. For regulatory or GMP reports with fixed formats, our project team maps and validates them against templates and specifications provided by the client.
Didn't find the answer?
Use the technical enquiry form to describe your site; we will route it to the right engineer. For urgent issues, call our service hotline.
Talk to an engineer
Give your site issue to engineers who understand the process
Describe your site and issue, and we will route it to the right specialist.
Submit
Describe the equipment, symptoms and steps already taken.
Engineer responds
A specialist reviews and provides initial remote support.
Close the loop
If site service is needed, we schedule it and record the resolution.
Talk to an engineer
Describe your site and issue, and we will route it to the right specialist.