Search
Site search
Search across products, solutions, news and resources.
Results for
“SCADA”
13 results
Products
View all
SCADA platforms01Plant-wide SCADA Supervision Platform
A plant-wide supervision platform integrating PCS, EMS, BMS and utilities over redundant servers and industrial networks.
Online water monitoring02Online Water Quality Monitoring & Instrument Integration
Online analyser selection, installation, calibration and SCADA integration for water, wastewater and industrial water systems.
Projects
View all
Pharma & food01Mindray Guangming Production Base — Cleanroom SCADA
BMS on level 2 plus DAS on levels 2–4 and utilities, collecting cleanroom and equipment data into one traceable view.
Lens Technology Vietnam — SCADA Monitoring System
Automation and equipment data integration covering process monitoring, redundant control, alarms and production reporting.
Solutions
View allNews
View all
Company newsMindray Guangming cleanroom SCADA supervision system
The project record covers cleanroom equipment monitoring, redundant control, alarms, trends and production reporting in one operating view.
Learn more
Technical articlesThe four-layer SCADA architecture: from field devices to management
How management, operations, PLC control and field-device layers work together, and where redundant servers and industrial networks fit.
Learn more
Technical articlesDefining the boundaries between BMS, EMS and SCADA
When environmental monitoring, building control and plant supervision share one system, interfaces, alarm ownership and data responsibility must be defined first.
Learn moreFrequently asked questions
View allHow should I troubleshoot when the SCADA host cannot connect to the PLC?
Work in order from physical to application layer: check PLC and switch indicators, power and cabling; verify IP address, subnet mask and VLAN; confirm ports, protocol configuration and access permissions; finally check register addresses and data mapping. If there were recent network or equipment changes, review the change record first.
What should I do if a historical trend suddenly stops?
First confirm whether live values are still updating, to distinguish acquisition, communication and storage issues. Check SCADA service status, disk space, historian connectivity and time synchronisation. If multiple sites fail simultaneously, inspect the central network or servers first; a single-site failure is more likely an edge device or communication link issue.
Does SCADA support electronic signatures and audit trails?
User permissions, operation records and audit trails can be configured against the project validation strategy. Whether electronic signatures are enabled and how audit records are scoped and retained must be confirmed during validation against the client's quality system and applicable regulations.
Resources
View allSTART A PROJECT
The next system starts with
a high-quality conversation.
Tell us about your process, site and objectives. Our engineering team will respond within one business day.

