Search
Site search
Search across products, solutions, news and resources.
Results for
“EMS”
14 results
Products
View all
SCADA platforms01Plant-wide SCADA Supervision Platform
A plant-wide supervision platform integrating PCS, EMS, BMS and utilities over redundant servers and industrial networks.
Smart building platforms02IBMS Smart Building Platform
A 3D visual platform unifying building automation, fire, security, lighting, energy and video systems from campus to equipment level.
Environmental monitoring03EMS Environmental Monitoring System
Online environmental monitoring for cleanrooms and laboratories, covering particles, temperature, humidity, dew point and differential pressure.
Projects
View allSunwoda Huizhou Buildings 1–3 — EMS Monitoring
Automation and equipment data integration covering process monitoring, redundant control, alarms and production reporting.
Laboratories02HKUST Quantum Technology Laboratory — BMS / EMS
BMS on level 2 plus DAS on levels 2–4 and utilities, collecting cleanroom and equipment data into one traceable view.
Laboratories03Bao'an TCM Research Center — BMS / EMS
BMS on level 2 plus DAS on levels 2–4 and utilities, collecting cleanroom and equipment data into one traceable view.
Solutions
View allNews
View all
Company newsLens Technology Vietnam plant: FMCS facility monitoring system
The FMCS facility monitoring system at Lens Technology's Vietnam plant is in operation, with chilled water, cooling water, CDA and process exhaust systems monitored centrally from the control room.
Learn more
Company newsBaiyun Airport T3: negative pressure and roof cooling systems installation and commissioning
The Baiyun Airport T3 terminal project has entered installation and commissioning of the negative pressure system and roof cooling system, with pump sets, control panels and piping progressing on schedule.
Learn more
Technical articlesDesigning EMS data integrity for GMP environments
From accounts and audit trails to time synchronisation and backup, data integrity in environmental monitoring requires a system-level design.
Learn moreFrequently asked questions
View allResources
View allSTART A PROJECT
The next system starts with
a high-quality conversation.
Tell us about your process, site and objectives. Our engineering team will respond within one business day.
